Work-Station (m) | Tasks assigned for each workstation | Station Time (min.) | Idle Time (min.) |
1 | 1,2,3,4,5,6,7,8,9,10,11 | 90.79 | 61.54 |
2 | 12,13,14,15,16,17,18,19,20,21,22,23,24 | 122.39 | 29.94 |
3 | 25,26,27,28,29,30,31,32,33,34,35,36,37,38,39 | 108.84 | 43.49 |
4 | 40,41,42,43,44,45,46,47,48,49 | 69.33 | 83.00 |
5 | 50,51,52,53,54,55,56,57,58,59,60,61,62,63 | 68.28 | 84.05 |
The total idle time (Tid) = 303.02 min., The workload variance (wv) = 457.03, The line efficiency (E) = 75.11%. |